Steel Building Project Case Studies In North Tyneside
Take a look at some of the steel building projects we've completed across North Tyneside and the surrounding areas. From commercial units to retail refurbishments and bespoke structural work, each case study shows the quality, expertise and attention to detail that J Dalby & Son bring to every job. Whether it's full design and build or a specialist installation, our work speaks for itself.
Datim Building - Steelwork and plant deck at Zara, Metrocentre
Installation of supporting steel on the Zara shop floor and a steel plant deck on the roof.
Duration | 17 months |
Industry | Retail |
Summary | Increased warehouse space by 30% |

Locomotion Business Park – New build project, Killingworth
Design and construction of new industrial units in 2024, handling everything from concept to completion. The project included custom design, steel fabrication, cladding, and finishing, ensuring durability, functionality and efficiency.
Duration | 21 months |
Industry | Industrial units |
Summary | Cost savings on heating 20% year on year |

Hubbway Hire – New build offices and workshop, Cramlington
A full design and build project involving custom design, fabrication, and construction, ensuring high-quality results delivered on schedule.
Duration | 8 months |
Industry | Industrial |
Summary | Limited time with a quick around |

Datim - Primark, Metrocentre
A complex steelwork project completed in the Metrocentre, requiring precision and careful coordination. The work met strict specifications while minimising disruption, delivering a high-quality result on time and to standard.
Duration | 3 months |
Industry | Retail |
Summary | Providing an extra 15% floorspace |

Ovington Boats, North Shields
A bespoke steel framework was designed, fabricated, and installed for a boat manufacturing facility, meeting precise industry needs and exceeding expectations by completing the project ahead of schedule.
Duration | 3 months |
Industry | Industrial |
Summary | New build |

S&B EPS
A new warehouse was designed, fabricated, and constructed to enhance manufacturing productivity, delivering a durable, high-quality structure.
Duration | 3 months |
Industry | Industrial |
Summary | New build |